Melbourne & Victoria · Supply and installation

Steel frames and structural steel for Melbourne builders

One partner. Complete framing solutions.

Light-gauge steel wall, floor and roof frames, the structural steel that goes with them, and the crew that stands it all up. Detailed to your plans, certified by our engineers, supplied across Melbourne and regional Victoria, with delivery dates agreed for your project.

LGS + steelFrames and beams from one supplier
Supply or installFrames only, or a fully installed shell
CertifiedProject-specific engineering and documentation
Light-gauge steel wall frames and floor trusses standing on a slab in Doncaster East, with a roof beam being set

What we do

The frame, the steel, and the people who put it up

Most builders juggle a frame supplier, a steel fabricator and an installer, and carry the gaps between them. FrameSet takes all three.

Assembled light-gauge steel wall frames on site

Light-gauge steel frames

Wall panels, floor joists and roof trusses rolled from G550 coil, detailed in FrameCAD to your architectural and structural drawings.

  • Townhouses, dual occupancy and granny flats
  • Single and double storey
  • Labelled, packed and craned to site
LGS frames →
Crane truck lifting a steel beam onto a frame

Structural steel

Beams, columns, lintels and portal frames fabricated from shop drawings, with the holes, cleats and coating your detailer specified.

  • Fabricated to AS/NZS 5131
  • Hot-dip galvanised or painted
  • Delivered with the frame, not after it
Structural steel →
Install crew carrying a floor truss on site

Installation and extras

Our crews stand the frames and set the steel. Add fall guard, flooring, windows and roof plumbing through our partners if you want one line on the contract.

  • Ground floor, first floor, roof
  • Crane, edge protection, walkways
  • Certificates and computations at handover
Installation →

Meet FrameSet

Frames, structural steel and installation. One partner.

See how we bring your framing package together, from your drawings to installation on site.

Videos load from YouTube when you press play. English captions are available.

How it works

From your plans to a standing frame in five steps

Plans in

Send the architectural set. We quote the frame, the steel and the install, itemised.

Detailing and sign-off

Our detailers draw every panel and beam. You check openings, heights and services before anything is rolled.

Production

Frames are rolled and assembled, steel is fabricated. You get a production date in writing.

Delivery and install

Craned to site in sequence. Our crew stands the ground floor, the first floor, then the roof.

Certificates

Engineer's design and inspection certificates, computations and the roof plumbing certificate, all on handover.

Why steel

Straight, light, termite-proof, and quick to stand

Factory-assembled steel panels help organise site installation. Steel is non-combustible and is not a food source for termites; the building still needs appropriate fire, moisture and termite detailing.

Termite-proof

Termites do not eat steel. Whole-building termite requirements still apply.

Non-combustible

Steel does not add fuel to a fire.

Straight walls

Dimensionally stable framing, with connections and finishes detailed for the project.

Lighter on site

Panel sizes, pack weights and crane access are planned for your site.

Compliance and standards for steel framing →

Framing for your project

From a second dwelling to a multi-unit site

Choose the framing package around your drawings, site access and construction sequence.

Townhouses

Wall panels, floor systems, roof trusses and structural steel coordinated across multiple dwellings.

Townhouse steel framing →

Granny flats and second dwellings

Project-specific frames with delivery and installation planning for established residential sites.

Granny flat steel frames →

Questions builders ask

Your questions answered

Do you supply steel frames only, or install as well?

FrameSet quotes frames only, frames with structural steel, or supply and installation. Installation and any extras are itemised so you can see what is included.

What drawings do I need for a framing quote?

Start with architectural drawings in PDF and the project suburb. Structural drawings, window and door schedules, an energy report and your target site date help us define the scope. We identify assumptions or missing information in the quote.

What affects steel frame lead times?

Drawing completeness, design changes, engineering, factory availability and site access affect the programme. Detailing, approval, production, delivery and installation dates are agreed for each project; an enquiry does not reserve a production slot.

Who coordinates the frame engineering?

FrameSet coordinates the frame detailing with a registered structural engineer. The design documents, certification and inspection requirements are confirmed for the project with the engineer and building surveyor.

Do you service Melbourne and regional Victoria?

Yes. FrameSet is based in Mitcham and supplies Melbourne metropolitan and regional Victorian projects. Regional delivery, crane access and installation availability are confirmed when we quote.

Got a set of plans? We will quote the frame, the steel and the install.

Send us your plans →